I figure the project will take about 5 days (not really in a rush here) and will be a vast improvement (not hard since the little space doesn't even have an outlet for my fiance to plug in her hairdryer).
So far the plan is to do the floor in slate tiles, and the walls surrounding the tub in glass mosaic tile. The vanity will be upgraded to a double sink with drawers, along with the electrical (updated vanity lights, GFHC outlets and dimmers). My fiance picked out a beautiful set of paints to pull it all together.
No blog post would be complete with a few photos, so here are the "before" and "during" pics of the first day (a.k.a. "Demo Day").
I'm off to Home Depot to stimulate the economy...
1 comment:
It looks great, baby! You have already made it look better... which is sad since there is only half a wall not in the shower.
Post a Comment